Skip to main content

Search all content

1 - 2 of 2 results
AS/NZS 3666.1:2011 Air-handling and water systems of buildings - Microbial control, Part 1: Design, installation and commissioning 2011 cover

Publisher
Standards Australia/Standards New Zealand

Version:  Third Edition 2011.  (Pending Revision)
Short Description
Specifies minimum requirements for the design, installation and commissioning of air-handling and water systems of buildings for the purposes of microbial control. It does not include requirements for refrigerated room airconditioners and non-ducted split systems.
AS/NZS 3500.4:2025 Plumbing and drainage, Part 4: Heated water services 2025 cover

Publisher
Standards Australia/Standards New Zealand

Version:  Fifth Edition 2025.  (Current)
Short Description
AS/NZS 3500.4:2025 specifies the requirements for the design, installation and commissioning of heated water services using drinking water or rainwater or a combination thereof. It includes aspects of the installation from the valves on the cold-water inlet to any cold-water storage tank or water heater and the downstream fixtures and fittings. It applies to new installations as well as alterations, additions and repairs to existing installations