Skip to main content

Search all content

1 - 10 of 15 results
NatHERS 2022: Whole of Home Overview 2022 cover

Publisher
NatHERS

Version:  2022.  (Current)
Short Description
The Nationwide House Energy Rating Scheme, or NatHERS, is being expanded to include Whole of Home assessments and ratings to support the proposed National Construction Code energy efficiency requirements for residential buildings in 2022; the changes will help households improve a home's energy efficiency and reduce energy use, which provides a range of benefits including lower energy bills, improved comfort and health for occupants, and reduced carbon emissions.
Summary of Engineered stone prohibition: Guidance for PCBUs 2024 cover

Publisher
Safe Work Australia

Version:  2024.  (Current)
Short Description
From 1 July 2024, persons conducting a business or undertaking (PCBUs) must not carry out, or direct or allow a worker to carry out, work that involves the manufacture, supply, processing, or installation of engineered stone benchtops, panels and slabs.
What is controlled processing of engineered stone? 2024 cover

Publisher
Safe Work Australia

Version:  2024.  (Current)
Short Description
A PCBU must implement control measures to eliminate or minimise risks arising from the processing of engineered stone, as far as is reasonably practicable.
Definition of engineered stone 2024 cover

Publisher
Safe Work Australia

Version:  2024.  (Current)
Short Description
The ban only applies to engineered stone: benchtops AND panels AND slabs.
Key terms used in the Engineered stone prohibition: Guidance for PCBUs 2024 cover

Publisher
Safe Work Australia

Version:  2024.  (Current)
Short Description
Key terms used in Engineered stone prohibition.
Need more information on the engineered stone ban? 2024 cover

Publisher
Safe Work Australia

Version:  2024.  (Current)
Short Description
Handy information sheet grouping Safe Work Australia documents and state-specific WHS regulators.
Exemptions from the engineered stone ban 2024 cover

Publisher
Safe Work Australia

Version:  2024.  (Current)
Short Description
A work health and safety (WHS) regulator can exempt a type of engineered stone from the ban.
Resilient Homes Fund: Building industry fact sheet. Quoting and contracting resilience works (for licensed contractors) 2023 cover

Publisher
Queensland Government

Version:  2023.  (Current)
Short Description
Flood resilient design is one of the many ways Queenslanders can build their resilience to floods.
Planning permit exemptions for emergency recovery: Face Sheet (VIC) cover

Publisher
Victorian Government

Version:  2022.  (Current)
Short Description
Clause 52.07 is a provision of the planning scheme which supports immediate recovery following any emergency; it includes the establishment of temporary accommodation, the continued operation of business and services, repair of fences, provision of required materials and infrastructure and other emergency recovery activities.
Applying for a Planning Permit under the Flood Provisions (VIC) 2015 cover

Publisher
Victorian Government

Version:  2015.  (Current)
Short Description
This practice note provides guidance about making an application for a planning permit where flooding is a consideration and explains how an application will be assessed.